The project consisted of building the road system for the subdivision by shaping and compacting existing subgrade, and providing, placing and compacting 1-1/2” crushed base course.
Two ponds, approximately 2 acres in size and lined with PVC material, were built for fire protection. The project also consisted of providing, placing and compacting a 3” thick by 24’ wide asphalt pavement road approximately 10,000 feet in length, including the borrow ditch and back-slope.
Read Testimonial